15 Neat Facts About The Construction Of The Peterborough Lift Lock

Opening Peterborugh Lift Lock

 

July 25 2016

1. The Peterborough Lift Lock on the Trent-Severn Waterway—aka Lock 21—was built between 1896 and 1904 in an era when the strength of people, horse and steam power was shaping the transportation systems of a growing nation.

2. The Lift Lock was part of a larger construction project to canalize the Otonabee River—allowing the Kawartha Lakes to connect with Peterborough’s commercial centre.

3. To establish the foundations for the Lift Lock at Armour Hill during construction, 76,000 cubic yards of sand, soil and gravel were excavated until the limestone bedrock was reached 40 feet down.

Photo: Opening Day: July 9th, 1904

4. The presswells for the hydraulic rams were excavated a further 75 feet into the rock.

5. A foundation of granite blocks—some weighing a whopping ten tons—was lowered to the bottom to provide a footing for the rams.

6. When completed, over 26,000 cubic yards of concrete had been poured, without a single piece of *reinforcing steel.

7. The Lift Lock was the first lock to be built out of concrete, and at the time was the largest structure ever built in the world with unreinforced concrete.

8. The installation of the steel chambers and hydraulic rams by Dominion Bridge Company of Montreal began in 1901 and was completed in 1904.

9. The original steelwork is still in use today, modified by zinc refinishing and welding on the boat chambers. (New aluminum gates were added during the mid-60s.)

10. Peterborough’s Richard Birdsall Rogers (aka R.B. Rogers)—a civil and mechanical engineer from Peterborough who studied at McGill—oversaw the design and construction of the Lift Lock.

11. As originally built, the Lift Lock could generate all the necessary compressed air and water pumping pressure to operate the gate pivot engine, gate water seals and control systems by opening a water penstock set in the lock’s upper reach.

12. The natural gravity fall of water powered the lock’s internal machinery. This included a Taylor hydraulic air compressor, water turbines, water driven gate-engines and pumps.

13. The dual lifts are the highest hydraulic boat lifts in the world, with a lift of 19.8 m (65 ft).

14. The Lift Lock opened July 9th, 1904 to a huge crowd (see photo at top of post).

15. The Lift Lock, which was designated a National Historic Site in 1979, took eight years to construct.

For all photos visit: http://www.ptbocanada.com/journal/2016/6/22/neat-facts-about-the-construction-of-the-peterborough-lift-lock

 

Related Articles


New Boats: Beneteau Oceanis 34.1 – A Sleek, Good -Looking Delight To Sail

By Katherine Stone

There is nothing more that I enjoy than being with friends and messing about in boats. Messing about in brand-new boats on a champagne sailing day on Lake Ontario at the beginning of the summer doesn’t get any better. To have the new owner, Helmuth Strobel and Anchor Yachts dealer Pancho Jimenez aboard made it even more special, as they can also speak to what they truly enjoy about the boat. We keep our own boat in a harbour that has a long waiting list for boats over 35 feet, so this little gem would definitely fit the bill and feels like a much bigger boat. True to the spirit of the 7th generation Oceanis line, the 34.1 is built in Poland and replaces the 35.1. It is 1,000 lbs lighter, 14 cm narrower and has 29% more sail area.

Read More


Destinations

Peter Island Resort in the British Virgin Islands has Reopened

Peter Island Resort in the British Virgin Islands has opened its rebuilt and re-envisioned luxury private island in 2024 after the property closures from the Virgin Islands’ 2017 hurricane season. Peter Island Resort has been undergoing its transformation for over six years. Its evolution includes brand new and upgraded accommodations and new state-of-the-art facilities and five stellar beaches amid hundreds of acres of unspoiled tropical island.

Peter Island Yacht Club

The new Yacht Club will be a must on the itineraries of sailors, boaters and yachtsmen with a marina that can accommodate a range of vessels from power boats, sailboats and catamarans, to super yachts of up to 200 feet. Located in Sprat Bay harbor, the Yacht Club will be its own destination with a dedicated swimming pool for Yacht Club guests, Drunken Pelican restaurant and bar, a commissary, Sea Chest Boutique and a sports recreation area with pickleball, basketball and bocce ball courts and a lawn-games area. To protect the coral reef and marine life surrounding the island, moorings will be located in White Bay, Sprat Bay, Deadman’s Bay…

Read More